We use cookies to ensure the best performance for our website

Learn more

Workshop operation simulation and interdepartmental routing optimization

Our customer
A large metallurgical company
Context
  • Need for operational planning of process routing
  • Need to reduce the holding time in the ladle stage
  • Need for adapting to different production scenarios when changing product ranges
Industry
Metallurgy
Objectives
  • Reduce time loss by quick process adaptation
  • Improve the efficiency of smelting processes to increase production volumes
  • Reduce energy and resource consumption by minimizing the holding time in the ladle stage
Tasks
Solution
Result
  • Implement automatic planning of melting routes to reduce process downtime
  • Create tools for operators to track planned and actual melting routes
  • Develop a digital model of a workshop for dynamic simulation of various processing scenarios
Tasks
Solution
Result

  • A simulation operation model for the main and auxiliary equipment of the workshop has been built
  • An intuitive interface for simulating the operation of a workshop in various modes for three shifts ahead has been developed
  • A model for optimizing melting routes, as well as an interface for tracking actual routes with deviation highlighting, has been created
Tasks
Solution
Result
  • An effective model for optimizing smelting routes given converter production constraints has been built
  • An interface for tracking planned and actual smelting routes indicating the characteristics of operations and highlighting deviations has been developed
  • Simulation modeling of the shop equipment operation for three shifts ahead has been made, and an intuitive interface for the shop operation in various modes has been developed

3%

increase in production volume

1%

reduction of costs and expenses on electricity

TO PROJECTS