Workshop operation simulation and interdepartmental routing optimization
- Our customer
 - A large metallurgical company
 - Context
 - Need for operational planning of process routing
 - Need to reduce the holding time in the ladle stage
 - Need for adapting to different production scenarios when changing product ranges
 
- Industry
 - Metallurgy
 
        
        Tasks
    
    
    
        
        Solution
    
    
    
        
        Result
    
- Implement automatic planning of melting routes to reduce process downtime
 - Create tools for operators to track planned and actual melting routes
 - Develop a digital model of a workshop for dynamic simulation of various processing scenarios
 
        
        Tasks
    
    
    
        
        Solution
    
    
    
        
        Result
    

- A simulation operation model for the main and auxiliary equipment of the workshop has been built
 - An intuitive interface for simulating the operation of a workshop in various modes for three shifts ahead has been developed
 - A model for optimizing melting routes, as well as an interface for tracking actual routes with deviation highlighting, has been created
 
        
        Tasks
    
    
    
        
        Solution
    
    
    
        
        Result
    
- An effective model for optimizing smelting routes given converter production constraints has been built
 - An interface for tracking planned and actual smelting routes indicating the characteristics of operations and highlighting deviations has been developed
 - Simulation modeling of the shop equipment operation for three shifts ahead has been made, and an intuitive interface for the shop operation in various modes has been developed
 
3%
increase in production volume
1%
reduction of costs and expenses on electricity